Promould® Installation Instructions
Step-by-step instructions of Promould® exterior moulding
Installation Guide
These instructions are the standard procedure for moulding installation.
Before you begin
Execution of installation must conform to EIFS manufacturer’s requirements for Environmental conditions, application, material, preparation; and to Decorawall exhibits and specifications.
Brief reminder:
Frozen material should not be used.
Application to frozen Substrate is prohibited.
Temperature before, during and until coatings cure should not be less than 50C (41F).
- Preperation
The surface must be clean and dry, free of loose material or any foreign material. Dry and/or Cut the moulding onn site as per the architectural drawings and existing structure. - Apply adhesive
Apply adhesive of system manufacture to the back of the moulding in a vertical pattern, using 3/8″ notched trowel. If skinning occurs on adhesive, scrape off and replace it with fresh adhesive before installing the moulding a. - Press the moulding into place
Use temporary mechanical fastener as per selected manufacturers system to secure moulding while the adhesive cures. - Remove excess adhesive
Remove excess adhesive (if any) along the moulding before curing. Refer to - Follow the next steps
Follow the steps for System details and Exhibits below.
Substrate Details and Exhibits Installation
Exterior Insulation Finish System (EIFS) installation instructions
Before you begin
This procedure is recommended for the following systems: Polystyrene, Extruded Insulation, Wire Mesh, Fiber Mesh, Mineral Wool, Cement Board.
The process of the exhibit shall commence prior to Primer.
- Follow steps 1-5 above
Follow standard installation - Cement
Spread evenly a layer of cementitious over the moulding and the substrate at least 2″ each part. - Embed fiberglass
Embed a 4″ fiberglass mesh equally divided onto the cementitious, smoothen the surface. - Take a break.
Allow for curing time - Sand all surfaces and joints to a smooth finish.
Polystyrene systems Installation
This procedure is recommended for Polystyrene systems only.
Before you begin
Process of the Exhibit shall commence after the polystyrene is installed.
- Follow section 1.2 steps 1 to 5.
- Proceed with next step of the system (fist layer of the Cementitious).
- Overlap the fiberglass mesh on to the molding.
- Take a break.
Allow for curing time - Sand all surfaces and joints to a smooth finish
Masonry Detail Installation
Cementitious and caulking
Before you begin
Decorawall®’s decorative mouldings are to be used above or at the bottom of an opening, it should not be installed over weep holes. Refer to the Regional Building Code and/or to the National Building Code for clearance.
- Follow section 1.2 steps 1 to 5
- Apply caulking at the joint or the moulding to the substrate.
- Take a break.
Allow for curing time
Moulding to Moulding Detail
View Exhibit 5.A – Caulking.
- Install mouldings according to previous exhibits.
- At the junction of the mouldings leace a gap of no more that 13mm.
- Complete installation of the mouldings. Remove excess adhesive
- After the coatings have cured inseft a back Rod into the gap between the mouldings.
- Cover all joints with caulking.
Moulding to Moulding Detail
View Exhibit 5.B – Base coat and fibermesh
- Install mouldings according to previous exhibits.
- Mouldings should be installed tight against each other with space not exceeding 1/16″ (1.5mm)
- Apply a layer of about 1/8″ (3mm) thick of base coat over the miter joint per minimum 2″ (50mm) on each side.
- Embed a 4″ (100mm) onto the base coat and smoothen the surface.
- Take a break.
Allow for curing time - Sand all joints to a smooth finish.
Let’s start building something!
We can help you launch your project with curated collections of beautiful products.
Contact us for more info!
Ready to buy?
Find a distributor!
Our design collections have everything you need to design beautiful homes.
Contact us to find a distributor.
Decorawall Inc.
36 Shelley Road, Unit 3
Richmond Hill, ON L4C 5G3
info@decorawall.com
Tel: 905-787-9166
Toll-Free: 1-888-674-3626
Fax: 905-787-9618
Hours
Mon-Fri: 7:00 a.m. – 4:00 p.m.